Legal

Privacy policy

Last updated 17 November 2026. This explains what Zaptiz Life collects, why, who can see it and the choices you have.

The short version

  • We collect what you give us to run the service (your account and the time, goals, habits and journal you record) and basic security information.
  • We do not sell your data, show ads, or use advertising or analytics trackers in the app.
  • Your journal text, the notes on your entries and your habit notes are not visible to our administrators.
  • You can export your data and delete your account at any time. Deleted data is permanently removed after 30 days.

What we collect

Your account

Name, email address, a password (stored only as a one-way Argon2id hash), your timezone and date format, and optionally a phone number, country and profile photo.

What you record

Time entries (start, end, title, notes, category), businesses and projects, goals, habits and their check-ins, the family members you choose to add (a name and relationship, which are labels and not accounts), daily reflections, and your settings and targets.

Security information

Sign-in events with the time, IP address and device and browser type; a list of your signed-in devices; your two-factor secret (stored encrypted) and recovery codes (stored only as hashes); and a security audit log. These protect your account and let you review its activity.

On your device

A session cookie and a security (CSRF) cookie, both strictly necessary to keep you signed in. Your theme and sound preferences, and any entries you added offline that have not synced yet, are stored in your browser. The installable-app feature stores only static files and icons, never your data.

How we use it

  • To provide the service: tracking, goals, reports and reminders.
  • To keep it secure: detecting repeated failed sign-ins, new-device sign-ins, and abuse.
  • To send emails you need: email verification, password reset, security alerts, and, if you leave them on, reminders. We do not send marketing email.
  • To run and fix the service, including investigating problems you report.

Who can see your data

You. Other users can never see your data, and you can never see theirs.

Administrators. A small number of authorised administrators can open an account page showing account details, security information, settings and usage (including time entry titles, categories, businesses and projects). Their accounts must use two-factor sign-in. They cannot see your password, two-factor secrets, journal text, the notes on your time entries, or your habit notes. Every time an administrator opens an account it is recorded in an internal audit log.

Service providers. We use providers to host the service and to deliver email (currently Brevo). They process data only on our instructions to provide those services.

Legal. We may disclose information if the law requires it. We will tell you first where we are allowed to.

How long we keep it

  • While your account exists: your data, until you delete it.
  • After you delete your account: you are signed out everywhere and your name, email, phone, photo and two-factor details are removed immediately. The rest is permanently deleted after 30 days.
  • Security audit log: kept for up to 365 days and, after deletion, no longer linked to you.
  • Backups: database backups are kept for disaster recovery and removed on a rolling schedule of about 30 days.

Your choices

  • Access and export: download everything from Settings, or your time entries as a spreadsheet from Analytics.
  • Correct: edit your profile, entries and settings in the app.
  • Delete: delete your account from Settings.
  • Reminders and emails: turn reminders off in Family and notification settings.
  • Anything else: write to support@zaptiz.com.

Security

Passwords are hashed with Argon2id, you can turn on two-factor sign-in, sessions can be reviewed and ended, traffic is encrypted in transit, and access to the administrator area is restricted, two-factor protected and logged. No system is perfectly secure; if we learn of a breach affecting you, we will tell you promptly. See Contact to report a problem privately.

Children

Zaptiz Life is not for anyone under 16. If you believe a child has an account, contact us and we will remove it.

Changes

If we change this policy in a way that matters, we will tell you in the app or by email before it takes effect. The date at the top shows when it was last updated.

Contact

Questions or requests: support@zaptiz.com.